Phones answered 24/7Atlanta, GA 30315
Call (855) 974-4733
Phones answered 24/7Call now(855) 974-4733
Serving Fulton County

Pre-Construction Termite Treatment in Atlanta

Soil pretreatment for new slabs, foundations and additions, applied before concrete or backfill covers the ground.

  • Phones answered 24/7
  • Price explained before any work starts
  • Crawl spaces, attics and yards
  • Same-day visits when a technician is free

Get a fast quote

Fastest: call (855) 974-4733. Or send this and we call you back.

Pre-Construction

Pre-Construction Termite Treatment: what it covers

Quick answer

Pre-construction termite treatment in Atlanta is a soil termiticide applied to the ground, footings and slab areas before concrete is poured or the foundation is closed in. It protects the part of a new house nobody can reach later. A technician coordinates with your builder on timing, and phones are answered 24/7.

Pre-Construction Termite Treatment illustration for Atlanta, GA, with the city skyline in the background

The cheapest time to treat soil for termites is before it is covered. Once a slab is poured or a foundation is backfilled, the soil beneath it is out of reach, and later treatment has to work around concrete by drilling or trenching. Pre-construction treatment goes on while the ground is still open.

In Atlanta, this matters for new houses, additions, garages and the infill homes going up beside older crawl-space houses in places such as Inman Park and Adair Park. If you are a homeowner building, a builder scheduling trades, or a buyer asking what was done before the slab went down, this page explains how the work fits into a build.

Service area
Atlanta & Fulton County
Availability
Phones answered 24/7
Warning signs

Signs you need pre-construction termite treatment

Keep children, pets and neighbors out of an open treated site until the product has dried or settled as the label directs, and do not dig or regrade treated soil without calling first. Disturbing it can open a gap in the treated zone and cause a problem later.

  • You are building a new house on a cleared lot
  • An addition, garage or porch is being poured next to an existing house
  • A builder asks whether termite pretreatment has been scheduled
  • The site has old stumps, root balls or buried wood left from clearing
  • A slab is about to be poured and no one has confirmed the soil treatment
  • You are buying a new build and want to know what was done before the slab
  • An infill lot sits next to an older house that has had termite activity
Our process

How our pre-construction termite treatment visit works

  1. Coordinate with the builder

    The call line takes the address and build schedule, and the technician confirms who is on site, when the forms and gravel go in and when concrete is due.

  2. Site walk

    The technician looks at the footings, grade, plumbing rough-in and any buried wood or stumps, and notes where soil will be exposed.

  3. Price and plan explained

    You hear the treatment areas, the product approach and the price before application. Builders usually need this in writing for their records.

  4. Apply to open soil

    The termiticide is applied to the soil in the areas the label specifies, including footing trenches, slab areas and around plumbing penetrations, before vapor barrier and concrete.

  5. Protect the treated zone

    The technician explains what to avoid: rain washing product away before the pour, disturbing treated soil, and cutting new trenches after treatment without notifying the company.

  6. Record the work

    You get a record of what was treated and when, which is useful for the builder, the owner and any future buyer.

Cost

How much does pre-construction termite treatment cost in Atlanta?

Pretreatment pricing in Atlanta follows the size and complexity of the building, and the schedule.

Pre-Construction Termite Treatment pricing in Fulton County (2026)
JobTypical rangeWhat it includes
Slab footprintLarger slabs need more product and timegarages and patios count
Foundation typeSlab, stem wall and crawl space differfooting runs and stem walls add treatment areas
Number of visitsStaged builds may need twobefore pour and before backfill
Site accessMud and tight sites take longertreatment must happen while soil is open
ReworkQuoted separatelydisturbed or rained-out soil may need re-treatment

No dollar figures are listed because the price depends on the building plans. The price is explained on the phone and confirmed in writing before application. For general pricing questions see our Atlanta pest control cost guide.

Why treat the soil before the slab is poured?

Because a poured slab and finished grade cover the soil permanently. Treating open ground lets the product reach footing trenches, slab areas and plumbing penetrations directly, and avoids the drilling that later treatment needs. It is a one-time window in the build, which is why timing with the builder matters.

Termites do not need a big gap. Hairline cracks, expansion joints and openings around pipes give them a route into a slab house, so the treated zone is meant to be continuous.

When in the build does pretreatment happen?

It happens after grading, forms, footings and plumbing rough-in are in place and the soil is exposed, but before the vapor barrier and concrete go down. For a stem wall or crawl-space foundation, it also happens before backfill. The exact order depends on the builder's schedule and weather.

Rain can be a problem right after treatment if it washes product away or the label requires dry conditions. Tell the call line about the pour date so the visit is timed well. Same-day visits are possible only when a technician is free.

Does pretreatment mean the house is termite-proof?

No. Pretreatment lowers the chance that termites reach the structure through the treated soil, but it does not make a house immune. Landscaping, new utility trenches, wood-to-soil contact and moisture can all create gaps later, so an annual inspection is still a sound habit.

A new house also adds wood that termites find attractive: porch posts, fences, and mulch beds. Keep soil and mulch below the siding line and watch for tubes. See termite inspection for follow-up checks.

What if I am building an addition onto an older house?

An addition is a chance to treat soil on the new section, and a good time to have the existing house inspected too. The old part may sit on piers over a crawl space, and the new part on a slab, so the joint between them is a spot to check for termite entry.

If the old house has a crawl space, ask for it to be inspected before the addition is tied in. See crawl space pest and moisture work for what that involves, and termite control if activity is found.

What should a builder or owner tell the technician before the visit?

Tell the technician the foundation type, the planned pour or backfill date, whether plumbing and electrical rough-in are done, where stumps or fill were removed and who will be on site. Treatment has to happen while soil is open, so accurate timing information is what makes the visit useful.

Send the plans or a sketch if you have them. Garages, covered porches, patios and steps often get forgotten, and they are exactly the slabs that termites reach first when they are left out. Ask the technician to include every poured surface that touches the house.

If the schedule slips, call again. A treatment done two weeks before a delayed pour may need to be rechecked, especially if rain, equipment traffic or re-grading has disturbed the soil in between.

What records should I keep after pretreatment?

Keep the written record of the date, the areas treated, the product used and the company that applied it. It helps with later inspections, warranty questions with the builder and any future sale, when a buyer or lender may ask what was done before the slab was poured.

File it with the house papers rather than with the builder's invoices, so it travels with the property. A record is also what lets a future technician know whether treated soil may be present before they trench or drill around the foundation.

Options

Types and options for pre-construction termite treatment

Slab pretreatment

Soil under and around a poured slab is treated before the vapor barrier and concrete are placed. It focuses on edges, joints and any place a pipe or conduit passes through, since those are the usual routes termites use to reach the house.

Foundation wall and backfill treatment

For stem walls, basements or footings, the soil beside the foundation is treated before it is backfilled, so a continuous treated zone surrounds the structure. The timing depends on how the builder sequences the work.

Wood treatment for framing

Some builders ask for treatment of framing lumber or lower wood parts as a supplement. This is applied after framing is up. The technician and builder decide together whether it adds protection for the plan.

Fulton County

Why pre-construction termite treatment is different in Metro Atlanta

Infill near the BeltLine and in neighborhoods such as Inman Park and Adair Park puts new slab houses and townhomes next to century-old pier-and-beam houses. A new slab beside an older crawl-space house with past termite activity is a reason to treat the soil carefully and to coordinate with the neighbor's maintenance if you can.

Atlanta's red clay is dense and drains slowly, and heavy summer rain can wash loose fill and erode graded soil before it is covered. A builder working on a wet site may need to re-grade, and treatment applied to soil that later moves may not be where it was meant to be. Mention weather and re-grading to the technician.

Heavy tree canopy, around 45 percent of the city according to Trees Atlanta's 2023 report, means many lots come with large stumps and root systems that are cleared. Buried stumps and wood debris left in fill can feed termites later, so clear them out before the soil is covered. Many Atlanta builds also include decks, porches and retaining walls, which add wood near the soil.

Need pre-construction termite treatment today?

Call any hour and explain what is going on. You get a clear price before any work starts.

Related

Termite Control

Inspection, soil treatment and bait options for subterranean termites in Atlanta's crawl-space and slab houses.

Termite Inspection

A termite inspection that checks the crawl space, sills, piers and slab edges, not just the trim.

FAQ

Pre-Construction Termite Treatment FAQs

Who is responsible for scheduling pretreatment, the builder or the owner?

It depends on your contract. Many builders schedule it as part of the build, while owner-builders arrange it themselves. Ask your builder who is responsible, and ask for a copy of the record of what was applied and when.

Can pretreatment be done after the slab is poured?

Not in the same way. After the pour, the soil beneath is covered, so treatment usually means drilling and trenching around the edge, or bait stations. Those methods work but are more disruptive and are not a substitute for treating open soil.

How long does it last?

It depends on the product, the soil and what happens to the site afterward. Disturbed soil, new trenches and landscaping can reduce protection. A technician should not promise a fixed number of years without reading the product label.

Does it cover a porch or deck?

Slab porches and foundations that are poured at the same time can be treated. A wood deck on posts is a different structure. Mention porches, decks and garages when you book so they are included in the plan.

What if rain falls after treatment?

Heavy rain can matter, depending on the product label and how far the project has gone. Tell the technician and builder about rain so they can decide if a recheck or reapplication is needed before concrete goes down.

Do I still need termite inspections on a new house?

It is a sound habit. New houses can get termites, especially if mulch, wood or soil is piled up against the structure. A yearly inspection catches activity early. See termite control if you find signs.

Find Atlanta Pest Control on